Factories and workshops

What does our factory look like?

Tufted carpet production process

Yarn
Yarn guide for splicing
Weaving
Adhesive
Cover the bottom
drying
Inspect
Roll
Packaging and storage

Polyvinyl chloride (PVC) backing production process

PVC slime preparation
Position correction glue
Glue bonding on top
Adjust thickness
Dry and set
Cool down
Cutting
* After the blanket is split in half, the head and tail are butted together to prepare PVC slime.
* Cutting with guillotine type, punching two rows of 8 pieces at one time.

The production process of asphalt backing
is divided into two steps

J-box storage
Top velvet glue
Antistatic agent
Drying
Ready for use
J-box storage
Apply asphalt glue
Backing thickness
Cool down
Storage rack
Cut into pieces
Product testing